Compacting Part 2 – Removal of the goof

The step of clearing the way for the revamp didn’t take much time at all.  More effort was put into preparing the workspace and placing the bike. All the device and control cables terminated at a project box, located under the handlebar headlamp.  Since the control cluster, brake sensor, and momentary switch were going to stay, I just decided to cut the cables as close to the project box as possible. The cable mess was worse than I remembered.  It … Continue reading Compacting Part 2 – Removal of the goof